Type of ActivityRebt
Project Profile onCarpentry
Project Introduction

carpentry, the art and trade of cutting, working, and joining timber. The term includes both structural timberwork in framing and items such as doors, windows, and staircases. Carpenters make parts of buildings, such as staircases, door frames, and rafters. Their work may also include installing kitchen cabinets, countertops, molding, and trim. Carpenters use many hand tools such as saws, hammers, pliers, planes to smooth wood, and levels to tell if lines are straight. Construct, erect, install, or repair structures and fixtures made of wood, such as concrete forms; building frameworks, including partitions, joists, studding, and rafters; and wood stairways, window and door frames, and hardwood floors.

Process of Manufacture

1. Marking.
2. Planing.
3. Cutting.
4. Chiseling.
5. Finishing.

1. Name of the ProductDoors, Beds, Windows, Table, Chair, Almirah, etc.
2. Project Cost

2. Project Cost

Equipment NameClaw Hammer, Tape Measure, Utility Knife, Moisture Meter, Chisel, Level, Screwdriver, Sliding Bevel, Layout Square,
a. Land Workshed Rental Cost/Eqipement (in Rs.)₹ 700,000.00
b. Working Capital (in Rs.)₹ 280,000.00
Total Project Cost (in Rs.)₹ 980,000.00
3. Estimated Annual Production Capacity:
Particulars Capacity in No. Rate Total value
Doors 100 5000 500000
Windows 300 2000 600000
Almirah 50 8000 400000
Beds 100 40000 400000
Table 60 2500 150000
Chair 200 800 160000
4. Raw Material (in Rs.)₹ 5,000,000.00
5. Packing Material (in Rs.)₹ 25,000.00
6. Wages (1-Skilled & 1-Unskilled) (in Rs.)₹ 360,000.00
7. Salaries (in Rs.)₹ 120,000.00
8. Administrative Expenses (in Rs.)₹ 24,000.00
9. Overheads (in Rs.)₹ 30,000.00
10. Miscellaneous Expenses (in Rs.)₹ 20,000.00
11. Depreciation (in Rs.)₹ 70,000.00
12. Insurance (in Rs.)₹ 20,000.00
13. Interest (As per the PLR)

13. Interest (As per the PLR)

a. C.E.Loan (in Rs.)₹ 37,800.00
b. W.C Loan (in Rs.)₹ 15,120.00
14. Working Capital Requirement

14. Working Capital Requirement

a. Fixed Cost (in Rs.)₹ 594,000.00
b. Variable Cost (in Rs.)₹ 5,075,000.00
c. Requirement of WC per Cycle (in Rs.)₹ 171,000.00
15. Cost Analysis
a. Fixed Cost
100% 60% 70% 80%
594000
b. Variable Cost
100% 60% 70% 80%
5075000
c. Cost of Production
100% 60% 70% 80%
50,00,000
d. Projected Sales
100% 60% 70% 80%
87,30,000
e. Gross Surplus
100% 60% 70% 80%
37,30,000
f. Expected Net Surplus
100% 60% 70% 80%
33,57,000
Enter Your Email IdEmail hidden; Javascript is required.
Previous Loan Application Download

Upendra Maharathi Shilp Anusandhan Sansthan
Patliputra Industrial Area
Patna – 800 013. Bihar. India.

Opening Hours:

Mon – Sat: 10:00 am – 05:00 pm

Meeting Hours:

Artisans/Weavers can meet Director on every Saturday between 3:00PM to 5:00 PM.

Subscribe For Latest Updates

The latest UMSAS news, articles, and resources, sent straight to your inbox every week.

Total No Of Visits